Doug Wachsnicht

Doug Wachsnicht has been with Goodwin Brothers since 1996 and has served as vice president since 2010. In over 20 years at Goodwin Brothers, Doug’s primary focus has been on the water markets. Doug currently oversees water projects from concept to closeout in the role of project executive. This includes working with clients in the early planning stages to determine project feasibility and possible delivery methods. Doug’s successes have included both design-bid-build and design-build projects in the public and private sectors totaling hundreds of millions of dollars in construction value. This gives Doug a well-rounded knowledge of the different delivery methods in a wide variety of project types, sizes, and scopes. Doug was integral in two of the first water and wastewater treatment plant projects to utilize design-build delivery in the state of Missouri. These projects received both regional and national acclaim while serving as a catalyst for design-build legislation in Missouri.

Doug maintains long-standing memberships with WEF, AWWA, WDBC, and IFEBP. In addition, Doug represents AGC as a trustee for the Greater St. Louis Laborers Pension Fund.