The North Davis Sewer District Biosolids Progressive Design-Build Project

With Utah’s population expected to nearly double by 2050, several of the biosolids treatment processes at or over capacity, and outdated technology hampering overall efficiency, North Davis Sewer District (“the District”) needed to expand and improve its facility.

In 2010, the District hired Brown & Caldwell (BC) to complete a Biosolids Master Plan, which included recommendations to handle projected future solids production, increase capacity, and significantly increase energy efficiency. Due to BC’s familiarity with the plant and proven performance, BC was rehired in 2012 to bring its recommendations to life through a $58 million capital improvement project.

When it came time to choose a delivery method, the District wanted a team that was qualified, offered a single point of responsibility for design and construction, would provide high-quality workmanship, and would collaborate throughout. The District was ultimately drawn to the progressive design-build delivery method to achieve these objectives. Tight collaboration with the District was critical to designing around their specific preferences for equipment selection, configuration, control, and functionality. BC also performed open book and transparent guaranteed maximum price negotiations, enabling the District to have an earlier understanding of construction costs, along with greater control over scope and equipment selection.

To maintain cash flow and maximize local involvement, the program was broken down into three projects/phases:

Phase 1 – Secondary Digester Mixers: This phase expanded the current digestion process capacity by converting unmixed and unheated secondary digesters to mixed mesophilic digesters by adding draft tube mixing and heating. By conducting structural analysis and a condition assessment of existing digesters, our team was able to reuse the existing secondary digester tanks and covers, saving $8 million in capital costs.

Phase 2 – Primary Sludge Thickening: The second phase included the construction of a new 15,000 square foot sludge thickening building, which eliminated the need for two new digesters and saved the District approximately $22 million.

Phase 3 – New Cogeneration Facility: The District was committed to significantly reducing the plant’s reliance on coal-fired power and using their biogas waste as a renewable energy source. To accomplish the District’s sustainability goals, a new combined heat and power system was constructed along with other process improvements to generate renewable electricity from the biogas and provide thermal energy for process heating needs.

Phase 3 included the installation of two new, high-efficiency, 1,100 kW Advanced Reciprocating Engine System lean-burn engine-generators, which operate at over 40% electrical efficiency, a 36% increase over the previous engines. The increased engine size and efficiency allows the plant to fully utilize biogas for 100% of the plant’s process heating and up to 90% of the total plant’s power requirements, now and into the future. Additionally, air emissions were significantly reduced allowing the District to remain below the threshold of a major source classification. This achieves a net greenhouse gas reduction while turning waste into electricity.

The District’s expectations for budget and schedule performance were exceeded when construction was completed on schedule and $5.8M under budget. Total project cost savings gained through progressive design-build innovation is estimated at more than $30M, achieved by avoiding the need for two new digesters that were included in the original scope, reusing existing tanks and covers, and an efficient procurement plan.

The North Davis Sewer District Biosolids Design-Build Project recently won the 2016 ACEC Utah Engineering Excellence Award.

Gus Hrncir, DBIA, National IPD Sales Services Manager, Brown and Caldwell

About Gus Hrncir, DBIA, National IPD Sales Services Manager, Brown and Caldwell

Gus Hrncir (pronounced Hen-chur) is a National Sales Services Manager at Brown and Caldwell, focused on collaborative project delivery. He brings 15 years of experience in development phase leadership and capture management of large infrastructure projects, focused on design-build, design-build-operate, construction management at-risk (CMAR), and public-private partnership (P3) delivery models. His attention has been on water and wastewater treatment, water quality, water resources, watershed management, groundwater management, capital improvements planning, and water legislation and regulation.
Topics: Brown and Caldwell, Progressive Design-Build.