Yes. If the technical and performance requirements are adhered to by the design-build team, the final project will be comparable to or better than a design-bid-build project, without the potential for designer-contractor conflicts that can cause delays and additional problems. To further ensure the quality of any project, formal quality assurances and quality controls must be in place and utilized throughout the delivery of a project.