Such a perception can be an issue for an Owner. However, it can be mitigated by ensuring that the bidding process is competitive, open, and transparent, and that the final contracts can withstand rigorous scrutiny by all parties, especially the public.

Subscribe to WDBC Blog
Posts by Topic and Firm
- Acceptance Standards
- AECOM
- Allowances
- Aqua-Aerobic Systems
- Arcadis
- Best Practices
- Best Value
- Black & Veatch
- Brown and Caldwell
- Burns & McDonnell
- Carollo
- CDM Smith
- Clark Construction
- CMAR
- Collaborative Delivery
- Construction Law
- Contingency
- Contracts
- Core and Main
- Craft Labor
- Crist Engineers
- Crossland Heavy Contractors
- CWSRF
- Design-Build
- Design-Build-Operate
- Dispute Board
- Earned Performance Fees
- Education
- Enerfab
- Equipment/Technology Suppliers
- ESG (Energy Systems Group)
- Evoqua
- Fixed-Price Design-Build
- Flatiron
- Garney
- Garver
- Goodwin Brothers
- Guaranteed Maximum Price
- Haskell
- HDR
- Integrated Design Manager (IDM)
- Jacobs
- Kiewit
- Kokosing
- McCarthy
- MWH
- O&M
- OBG
- Off-Ramp
- Open-Book Pricing
- Owner Advisor
- Owners
- P3
- Parsons
- PC Construction
- PCL
- Performance Standards
- PLW Waterworks
- Procurement
- Progressive Design-Build
- Ramboll
- Research
- Reynolds Construction
- RFP
- Rice Lake
- Risk Allocation
- Risk Register
- Safety
- Spearin Doctrine
- Stantec
- TBL
- Technology
- The Walsh Group
- Ulliman Schutte
- Uncategorized
- Value Engineering
- Value of Water Coalition
- Victaulic
- Virtual Design & Construction (VDC)
- Wastewater Infrastructure/Treatment
- Water Design-Build Project
- Water Infrastructure/Treatment
- Water Week
- WDBC Admin
- Xylem