A table, created by either the owner or the collaborative-delivery firm and agreed to by both parties, that identifies potential project risks and allocates responsibility for each between the owner and the firm, with the objective of reducing the project’s risk-related costs by addressing them at the outset.

Subscribe to WDBC Blog
Posts by Topic and Firm
- Acceptance Standards
- ACCIONA Agua
- AECOM
- Allowances
- Arcadis
- Austin Industries
- Best Practices
- Black & Veatch
- Brown and Caldwell
- Burns & McDonnell
- Carollo
- CDM Smith
- CMAR
- Collaborative Delivery
- Construction Law
- Contingency
- Contracts
- Core and Main
- Craft Labor
- Crossland Heavy Contractors
- CWSRF
- Design-Build
- Earned Performance Fees
- Education
- Enerfab
- Equipment/Technology Suppliers
- Evoqua
- Fixed-Price Design-Build
- Flatiron
- Garney
- Goodwin Brothers
- Guaranteed Maximum Price
- Haskell
- HDR
- Jacobs
- Kiewit
- McCarthy
- O&M
- OBG
- Off-Ramp
- Open-Book Pricing
- Owner's Advisor
- Owners
- P3
- Parsons
- PC Construction
- PCL
- Performance Standards
- PLW Waterworks
- Procurement
- Progressive Design-Build
- Research
- Reynolds Construction
- RFP
- Rice Lake
- Risk Allocation
- Safety
- Spearin Doctrine
- Stantec
- TBL
- The Walsh Group
- Ulliman Schutte
- Uncategorized
- Value Engineering
- Value of Water Coalition
- Wastewater Infrastructure/Treatment
- Water Design-Build Project
- Water Infrastructure/Treatment
- Water Week
- WDBC Admin
- Xylem